Operating cases and fluid basis
Review the flow cases, fluid properties, pressures and temperatures used across the available documents. Identify assumptions requiring confirmation, including the viscosity and thermal basis used for equipment evaluation.
Possible output
A basis review note with open questions, assumptions and required confirmations.
Separator and coalescer requirements
Compare process datasheets and technical proposals against the stated separation objectives and operating requirements. Document differences in the proposed basis, scope and supporting information so that clarification discussions address the same requirements.
Possible output
A process comment register or technical clarification list.
Heating and hydraulic interfaces
Review the process requirements connecting separation equipment with heat exchangers, heaters and associated piping. Within the agreed scope, examine equipment duties, pressure requirements, utility needs and the consistency of interface conditions.
Possible output
Interface comments and a calculation note where calculations are included.
Documents and package boundaries
Check process connections and responsibilities across PFDs, P&IDs, datasheets and supplier documents. Record gaps or conflicting information, including interfaces with produced-water handling and sand-management systems where relevant.
Possible output
An interface register with actions for the responsible parties.